Day 17

It was a great day today. Kevin got a text this morning from Adam the guy down at the ski area asking if we wished to help him pick up some boards. These boards will be used to box in the central beam. We are not sure yet if we will be involved in that part of the project. It all depends on when the work commences on that part of the project. As I said earlier we were not supposed to do this part but we are always willing to help them out.
Hours:1:00
Total: 61:30
The factory we went to pick up the wood!

Adam securing the boards!

Comments

Popular posts from this blog

Day 1

The moment we rolled into the ski area to begin our day I had no idea what lied ahead. The day started with removing the old lighting fixtures that were down there. However, we made quite short work of that and moved on to putting up strapping. Soon a delivery arrived that we unloaded. But we were soon back on track. At about 12 we broke for lunch. After lunch work started up again. We helped Mike (the school's electrition) rough in the electrical. Day one was a success. Hours: 5:10 Kevin Removing Wiring.  The before shot. Kevin and Adam putting up strapping.  The strapping and wiring in on one-half.  

Day 10

When we showed up today the project was looking really good with all the lights cut out. I began by applying joint compound (mud) the second half of the ceiling while Kevin sanded. We also cleaned up the work space. Then Garry came by and told us to clean the surrounding walls to get the room ready to begin paint. We did that and then broke for lunch. After lunch, we continued to clean and prep for paint. We also cleaned the shop floor of urethane. Today was a good day. Hours: 5:30 Total: 44:00 Second half with joint compound! The first half sanded! The first half when we left!

Day 5

Today when we showed up we began by sanding the boards that had urethane on them from the day prior. After that we began to apply the third coat of urethane. While waiting for them to dry we did other work around the ski area like filling in some damage from the winter. After that we broke for lunch. After lunch we put on yet another layer of urethane to make sure it was fully covered after this morning.  Tomorrow we will begin the same way with sanding because we need to make sure that the boards are really smooth and ready for a final coat. Hours: 5:00  Total: 22:50 Filling holes. Boards after urethane and sanding.