Day 3

Today we showed up to an already half done insulation job. Adam had started earlier so by the time we got out which was 8:10, half was already done. Due to that we were able to complete the job in one day. The job was straight forward but tedious to string the insulation under all the strapping and to do this we had to where full body suits due to the hazards of fiberglass. However, we finished in just 3 hours which was quite fast. As I said yesterday this was planned to take 2 days or more. It was a fun day and tomorrow we will begin on varnishing boards.
Hours:3:00
Insulation in. 

All suited up. 

Other half done. 

Comments

Popular posts from this blog

Day 1

The moment we rolled into the ski area to begin our day I had no idea what lied ahead. The day started with removing the old lighting fixtures that were down there. However, we made quite short work of that and moved on to putting up strapping. Soon a delivery arrived that we unloaded. But we were soon back on track. At about 12 we broke for lunch. After lunch work started up again. We helped Mike (the school's electrition) rough in the electrical. Day one was a success. Hours: 5:10 Kevin Removing Wiring.  The before shot. Kevin and Adam putting up strapping.  The strapping and wiring in on one-half.  

Day 10

When we showed up today the project was looking really good with all the lights cut out. I began by applying joint compound (mud) the second half of the ceiling while Kevin sanded. We also cleaned up the work space. Then Garry came by and told us to clean the surrounding walls to get the room ready to begin paint. We did that and then broke for lunch. After lunch, we continued to clean and prep for paint. We also cleaned the shop floor of urethane. Today was a good day. Hours: 5:30 Total: 44:00 Second half with joint compound! The first half sanded! The first half when we left!

Day 5

Today when we showed up we began by sanding the boards that had urethane on them from the day prior. After that we began to apply the third coat of urethane. While waiting for them to dry we did other work around the ski area like filling in some damage from the winter. After that we broke for lunch. After lunch we put on yet another layer of urethane to make sure it was fully covered after this morning.  Tomorrow we will begin the same way with sanding because we need to make sure that the boards are really smooth and ready for a final coat. Hours: 5:00  Total: 22:50 Filling holes. Boards after urethane and sanding.