Day 1

The moment we rolled into the ski area to begin our day I had no idea what lied ahead. The day started with removing the old lighting fixtures that were down there. However, we made quite short work of that and moved on to putting up strapping. Soon a delivery arrived that we unloaded. But we were soon back on track. At about 12 we broke for lunch. After lunch work started up again. We helped Mike (the school's electrition) rough in the electrical. Day one was a success.
Hours: 5:10
Kevin Removing Wiring. 

The before shot.

Kevin and Adam putting up strapping. 

The strapping and wiring in on one-half.  

Comments

  1. Looks like an awesome and productive first day! Can't wait to see how it progresses!!

    ReplyDelete
  2. Great progress Nathaniel. I am hearing great things about your progress and positive attitude. Take advantage of Will when he stops by as he has considerable construction knowledge! Great project!

    ReplyDelete
  3. Keep up the good work. Love the pictures, nice layout of your blog

    ReplyDelete

Post a Comment

Popular posts from this blog

Day 10

When we showed up today the project was looking really good with all the lights cut out. I began by applying joint compound (mud) the second half of the ceiling while Kevin sanded. We also cleaned up the work space. Then Garry came by and told us to clean the surrounding walls to get the room ready to begin paint. We did that and then broke for lunch. After lunch, we continued to clean and prep for paint. We also cleaned the shop floor of urethane. Today was a good day. Hours: 5:30 Total: 44:00 Second half with joint compound! The first half sanded! The first half when we left!

Day 19

Today was a good day down at the ski area. We began the day by staining the pieces that would soon cover the beam. After that we began putting them up this took time to get them perfect. However, soon we were on to trim we got up the first row and soon realized we were short pieces. We went to the lumber yard to get more. We stained and applied the first coat of urethane to these boards.  They go up tomorrow. Time: 6:00 Total: 67:30 Trim up! Boards to case in beam! First board up!

Day 20

Today we showed up at the ski area to find the boards applied urethane on the day prior to be dry. This means that we were able to get an another coat on them and put up three more strips in the morning. We then went to lunch and when we got back we put up the remaining strips. This signifies our last day down at the ski area. I will miss doing this every day. Hours: 6:00 Total: 73:30 Midway! All Done!